Target position must be equal to the first spline point

The axis receiving a Follow Spline Segment command must have its current TARGET POSITION equal to the position of the first spline point in the segment. This is required to avoid a discontinuity in TARGET POSITION at the start of the spline. An easy way to change the TARGET POSITION to a particular position is to issue a Go command to the position and wait for the axis to reach that position (by monitoring the In Position bit).

 